Pembroke 38kV Substation
Complete electrical installation for critical energy infrastructure
- 38kV ESB substation
- 100% of electrical works
- ATEX battery-room installation
Site: 24 South Lotts Road, Dublin 4
Brooklyn Engineering Services delivered the full electrical installation for the new Pembroke 38kV ESB substation, providing safe, reliable and future-ready infrastructure for this critical energy facility.
Project Scope
- New distribution boards and general electrical services
- Energy-efficient lighting and emergency lighting systems
- Fire alarm, access control and CCTV installations
- Rooftop photovoltaic solar installation
- Complete lightning protection system
Specialist ATEX Installation
Specialist ATEX-certified electrical equipment was installed within the battery room to meet hazardous-area requirements and stringent safety standards.
Every system was installed, tested and commissioned in accordance with relevant regulations, project specifications and client requirements.
Collaborative Delivery
Brooklyn worked closely with the client, ESB representatives and project stakeholders to coordinate the installation and deliver consistently high standards of safety, quality and technical performance.
Project Outcome
A robust, compliant and future-ready electrical installation supporting the safe and reliable operation of a key 38kV electricity substation in Dublin.
Delivery Highlights
- Reliability – comprehensive electrical infrastructure designed for dependable long-term operation.
- Safety – ATEX equipment and lightning protection delivered to exacting safety requirements.
- Delivery – coordinated installation, testing and commissioning with ESB and project stakeholders.